[1] EUROCONTROL. An assessment of Air Traffic Management in Europe during the calendar year 2013, Performance Review Report 3, Performance Review Commission. 2014.
[2] M. Şeker, N. Noyan. Stochastic optimization models for the airport gate assignment problem. Transportation Research Part E: Logistics and Transportation Review, vol. 48, no. 2, pp. 438-459, 2012.
[3] C. H. Cheng, S. C. Ho, C. L. Kwan. The use of metaheuristics for airport gate assignment. Expert Systems with Applications, vol. 39, no. 16, pp. 12430-12437, 2012.
[4] U. Dorndorf, A. Drexl, Y. Nikulin, E. Pesch. Flight gate scheduling: State-of-the-art and recent developments. Omega, vol. 35, no. 3, pp. 326-334, 2007.
[5] U. Dorndorf, F. Jaehn, E. Pesch. Modelling robust flightgate scheduling as a clique partitioning problem. Transportation Science, vol. 42, no. 3, pp. 292-301, 2008.
[6] Y. Cheng. Solving push-out conflicts in apron taxiways of airports by a network-based simulation. Computers & Industrial Engineering, vol. 34, no. 2, pp. 351-369, 1998.
[7] S. Y. Yan, C. M. Huo. Optimization of multiple objective gate assignments. Transportation Research Part A: Policy and Practice, vol. 35, no. 5, pp. 413-432, 2001.
[8] S. H. Kim, E. Feron, J. Clarke. Assigning gates by resolving physical conflicts. In Proceedings of AIAA Guidance, Navigation, and Control Conference, Chicago, USA, pp. 10-13, 2009.
[9] T. Obata. Quadratic assignment problem: Evaluation of exact and heuristic algorithms. In Technique Report TRS-7901, ACM, Rensselaer Polytechnic Institute, Troy, New York, USA, 1979.
[10] J. P. Braaksma. Reducing walking distance at existing airports. Airport Forum, vol. 7, pp. 135-142, 1977.
[11] O. Babić, D. Teodorvić, V. Tošić. Aircraft stand assignment to minimize walking. Journal of Transportation Engineering, vol. 110, no. 1, pp. 55-66, 1984.
[12] R. S. Mangoubi, D. F. X. Mathaisel. Optimizing gate assignments at airport terminals. Transportation Science, vol. 19, no. 2, pp. 173-188, 1985.
[13] H. Ding, A. Lim, B. Rodrigues, Y. Zhu. The overconstrained airport gate assignment problem. Computers & Operations Research, vol. 32, no. 7, pp. 1867-1880, 2005.
[14] J. F. Xu, G. Bailey. The airport gate assignment problem: Mathematical model and a Tabu search algorithm. In Proceedings of the 34th Annual Hawaii International Conference on System Sciences, IEEE, Maui, USA, pp. 1-10, 2001.
[15] C. M. Pintea, P. C. Pop, C. Chira, D. Dumitrescu. A hybrid ant-based system for gate assignment problem. Hybrid Artificial Intelligence Systems, E. Corchado, A. Abraham, W. Pedrycz, Eds., Berlin Heidelberg, Germany: Springer, vol. 5271, pp. 273-280, 2008.
[16] H. M. Genç, O. K. Erol, İ. Eksin, M. F. Berber, B. O. Güleryüz. A stochastic neighborhood search approach for airport gate assignment problem. Expert Systems with Applications, vol. 39, pp. 316-327, 2012.
[17] A. Bolat. Assigning arriving flights at an airport to the available gates. Journal of the Operational Research Society, vol. 50, no. 1, pp. 23-34, 1999.
[18] A. Bolat. Procedures for providing robust gate assignments for arriving aircrafts. European Journal of Operational Research, vol. 120, no. 1, pp. 63-80, 2000.
[19] A. Bolat. Models and a genetic algorithm for static aircraftgate assignment problem. Journal of the Operational Research Society, vol. 52, no. 10, pp. 1107-1120, 2001.
[20] S. Y. Yan, C. Y. Shieh, M. Chen. A simulation framework for evaluating airport gate assignments. Transportation Research Part A: Policy and Practice, vol. 36, no. 10, pp. 885-898, 2002.
[21] C. Y. Liu, N. J. Zhai. On multi-objective optimization of airport gate assignment with push-out conflict avoidance. In Proceedings of the 29th Chinese Control Conference, IEEE, Beijing, China, pp. 1802-1806, 2010.
[22] J. A. D. Atkin, E. K. Burke, S. Ravizza. A more realistic approach for airport ground movement optimisation with stand holding. In Proceedings of the 5th Multidisciplinary International Conference on Scheduling: Theory and Applications, Phoenix, USA, 2011.
[23] S. H. Kim, E. Feron. Impact of gate assignment on gateholding departure control strategies. In Proceedings of the IEEE/AIAA 31st Digital Avionics Systems Conference, IEEE, Williamsburg, USA, pp. 4E3-1-4E3-8, 2012.
[24] U. M. Neuman, J. A. D. Atkin. Airport gate assignment considering ground movement. Computational Logistics, vol. 8197, pp. 184-198, 2013.
[25] EUROCONTROL. Annual Safety Report, Safety Regulation Commission, ATM Safety Performance 2013, 2014.
[26] S. Liu, W. H. Chen, J. Y. Liu. Optimizing airport gate assignment with operational safety constraints. In Proceedings of the 20th International Conference on Automation & Computing, IEEE, Cranfield, Bedfordshire, UK, pp. 61-66, 2014.
[27] AIRBUS. Characteristics and maintenance planning. Technical Data Support and Services, Blagnac Cedex, France, 2005.